     Multi Campus Hydration Station                       PSA Specialist:
    Project-Group 2                                              Rey Pedregon   rpedregon@sandi.net   (619) 288-5592 

    Pre-Job Meeting:                                                      Bid ad:          09/16/2022
     Friday 10/20/22                                                          BOE award:  11/15/2022

     SITES:
      Alcott Elementary School (ES)-       4680 Hidalgo Ave., San Diego, CA 92117 
      Bay ParkES-                                 2433 Denver St., San Diego, CA 92110 
      Cadman ES-                                 4370 Kamloop Ave., San Diego, CA 92117
      Garfield ES-                                  4487 Oregon St., San Diego, CA 92116
      Longfellow ES-                              5055 July St., San Diego, CA 92110 
      Rodriguez ES-                                 825 S 31st St., San Diego, CA 92113
      Toler ES-                                      3350 Baker St., San Diego, CA 92117 
      Logan Memorial EC-                      2875 Ocean View Blvd., San Diego, CA 92113 
      Mission Bay Montessori Academy-   2640 Soderblom Ave., San Diego, CA 92122 
      Perkins K-8-                                  1770 Main St., San Diego, CA 92113 
      Riley School/New Dawn-                5650 Mt Ackerly Dr., San Diego, CA 92111 
      Whittier Center/Del Sol Academy-   3401 Clairemont Dr. San Diego, CA 92117
  
  
  
  
collapse Document Types : Bid Documents ‎(4)
Ad_Hydration Stations Group 2 2022-2 R9.22.pdf
  
11/8/2022 11:51 AMPedregon Rey
PSA Letter of Assent for Straight Line.pdf
  
11/8/2022 11:52 AMPedregon Rey
Site Visit Attendees_Handout_Hydration Group 2.pdf
  
11/8/2022 11:53 AMPedregon Rey
Straightline 24 hr Subcontractors List.pdf
  
11/8/2022 11:54 AMPedregon Rey
collapse Document Types : LOA and Sub Pre-Job Form ‎(5)
All Time Fence LOA and Sub Pre-Job.pdf
  
11/18/2022 12:23 PMPedregon Rey
ASE LOA and Sub Pre-Job.pdf
  
11/8/2022 11:55 AMPedregon Rey
B and M PAINTING LOA and Sub Pre-Job.pdf
  
11/8/2022 11:57 AMPedregon Rey
EL HOBBS LOA and Sub Pre-Job.pdf
  
11/8/2022 11:58 AMPedregon Rey
Paul J Construction LOA and Sub Pre-Job.pdf
  
11/8/2022 11:58 AMPedregon Rey
collapse Document Types : Pre-Job Form ‎(1)
Straight Line GC Pre Job Conference form.pdf
  
11/18/2022 12:18 PMPedregon Rey
collapse Document Types : Project Summary Report ‎(3)
83328726264 - Attendee Report.csv
  
11/18/2022 3:18 PMPedregon Rey
83328726264 - Q A Report.csv
  
11/18/2022 3:19 PMPedregon Rey
Recording Link for Pre-Job Hydration stations 12 sites grp 2.docx
  
11/18/2022 3:26 PMPedregon Rey